We are looking for reliable suppliers for heavy welded steel structures from mild steel. The steel structure must be heated before welding to ensure freedom from distortion. After welding, the construction must be stress-relieved.

The manipulation of the components requires a crane load of at least 15 tons.

The components are then to be painted by the supplier with a primer and a topcoat. The components are up to 4m long and 2m wide. Partly a milling is necessary.

Possible suppliers for this welded steel construction must have an operational certification according to EN ISO 3834.

This request is a continuous need with the possibility of follow-up orders. The parts are ordered on an order-specific basis and can vary slightly from project to project. The customer is a German company in the field of plant construction.